Tuesday 25 August 2015

Otmane El Rhazi : Barrambie PFS delivers positive results

Otmane El Rhazi from Mining Weekly | Ferrous Metals Home.

A prefeasibility study (PFS) into the Barrambie titanium project, in Western Australia, has highlighted the potential for the project to be a low-cost producer of titanium dioxide, vanadium pentoxide and iron-oxide. Owner Neometals on Tuesday reported that the project would produce an average of 98 000 t/y of titanium dioxide, 2 000 t/y of vanadium pentoxide and 234 000 t/y of iron-oxide over a mine life of nearly 20 years.

No comments:

Post a Comment